ECOroads® Frequently Asked Questions

 

- How is ECOroads different than traditional methods?

- How is ECOroads applied?

- Does ECOroads have any environmental impact?

- How much money can I save with ECOroads?

- Can I use ECOroads to build a highway/freeway?

- Is ECOroads certified by the U.S. Department of Transportation?

- How do I buy ECOroads? 

- How quickly can I build a temporary road with ECOroads?

- How long should I expect my ECOroads and/or road base to last?

How is ECOroads different than traditional methods?

ECOroads is quicker and less expensive than traditional methods of secondary and temporary roads and full access road bases.  ECOroads will increase your temporary roads life during your phases of construction.  It will increase the stability of your road base.  ECOroads helps soil achieve maximum compaction and binds the soil to make a permanent bond.  ECOroads will help prevent potholes, increase wheel load strength, resist moisture and prevent frost heaving.  All summed up a road made with ECOroads will last longer with less maintenance therefore saving time and money.

Back To Top

How is ECOroads applied?

ECOroads is added to the water truck used on the job site.  Just three pieces of equipment is needed to build the perfect road base using ECOroads.  You can download this information in our User’s Guide or e-mail us for further technical information.

Back To Top  

Does ECOroads have any environmental impact?

ECOroads is non-toxic.  It requires no special handling equipment and no special containment procedures as required with toxic and/or corrosive agents.  It does not irritate skin tissue and causes no rashes or burns.  ECOroads contains no combustible materials, is non-explosive and can used near open flames.  It is non-gaseous and can be stored in poorly ventilated areas.  It will not harm humans, animals, fish or vegetation under normal use and is totally biodegradable.

Back To Top

How much money can I save with ECOroads?

ECOroads is extremely cost-effective.  In most cases, you will save on the importation of materials to the job site as well as long term cost savings due to the reduction of maintenance. 

Approximate cost breakdown per cubic meter of raw material:

ECOroads
$4.00 per Cu. Meter
Asphalt
$60.00 per Cu. Meter
Concrete
$100.00 per Cu. Meter

Back To Top  

Can I use ECOroads to build a highway/freeway?

You can use ECOroads to build a stronger base before the asphalt or concrete topping is put on. 

Back To Top  

Is ECOroads certified by the U.S. Department of Transportation?

We currently have preliminary approvals from various Department of Transportations for Dust Control including California and Washington State.  We have preliminary approvals for soil stabilization in the state of Utah. 

Back To Top

How do I buy ECOroads? 

Please contact us and we will let you know if there is a local distributor in our area. 

Back To Top

How quickly can I build a temporary road with ECOroads? 

ECOroads takes just 72 hours to fully cure (harden) after compaction. 

Back To Top

How long should I expect my ECOroads and/or road base to last?

ECOroads treated roads have been in use for over 7 years, however, the longevity of a road is a function of several factors:

  • Climate conditions such as temperature ranges and rainfall
  • Types of soils used in construction
  • Road design - crowning, drainage and other engineered parameters
  • Type of vehicular traffic, speed and degree of usage
  • Wearing surface applied (if any)
  • General maintenance frequency and quality

ECOroads treated roads retain their integrity over longer periods than previously experienced by road departments and require at least 50% less road maintenance. ECOroads treated road bases simply last longer.

Back To Top